EasyManua.ls Logo

Planet IPM-8221 - Control

Planet IPM-8221
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IP-based 8-port Switched Power Manager with 2 Cascaded Ports
IPM-8221
- 25 -
4.2 Control
On the menu bar of the home page, select Control to access the scheduled task options page of the
PDU. You can query scheduled tasks and add new scheduled tasks for the socket.
Figure 4-2-1 Scheduled Tasks List Page Screenshot
In the schedule task list bar, you can retrieve the desired port schedule status by time.
Figure 4-2-2 Add Scheduled Task Page Screenshot
In addition, scheduled task TAB, you can add scheduled tasks based on your requirements, such as
socket port, switch type, time, working day, and remarks. Select the corresponding option and click the
Save button to save and generate a scheduled task. PDU will perform the corresponding scheduled
task operation at the set time.

Other manuals for Planet IPM-8221

Related product manuals