11
2.1. Operaon
The Hand Control has two funcons: namely both the control and
charging of the Ceiling Hoist.
2.1.1. Funconaloverviewbuons
Figure 4, PLS handset buons
Before the lowering funcon starts working, there should be a
load hanging on the hoisng belt (see secon 2.4.4).
If a Driven Trolley is mounted, the funcon buons are as follows;
Raise Spreader Bar
Lower Spreader Bar
Ceiling Hoist oCeiling Hoist on
Electrical lt
Spreader bar to
reclined posion
Forwards/
Backwards
Forwards/
Backwards
Electrical lt
Spreader bar to
seated posion
Baery charging
indicator