EasyManua.ls Logo

PLS AR-200 - Daily Maintenance; Weekly Maintenance; Annual Inspection and Maintenance

PLS AR-200
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
7.3. Beforeeachuse
Prior to each use an inspecon should be completed by the user of the Hoist.
Should any part of the system fail the inspecon, DO NOT use the Hoist.
Check whether all parts of the Ceiling Hoist are present.
Check the devices (liing slings) used for loose stching or
loose parts before each use.
Check the Spreader Bars connecon to the Central Suspension
Point. This must not be loose.
Check the state of the hoisng belt.
7.4. Weeklymaintenance
Weekly maintenance consists of the following acons:
Checking the operaon of the emergency stop and the height
limit switch (see secons 2.4.2 and 2.4.3).
Check whether all moving parts can move freely without any
annoying noises.
Check that the user manual, basic instrucon card and log book
are present.
If you have any doubts about the condion or correct
operaon of the Ceiling Hoist, always contact the technical
department or the distributor.
7 . 5 . A n n u a l i n s p e c o n a n d m a i n t e n a n c e 
The Ceiling Hoist must be inspected once a year in accordance with the
NEN-EN-ISO 10535 standard. The chargers should also be inspected every
year in accordance with the applicable requirements. These inspecons
should be carried out by the distributor or by another suitably authorised
body.
The distributor oers you the opon of having your Ceiling Hoist thoroughly
inspected once a year under a maintenance contract. Contact the distributor
for more details about this.

Related product manuals