OPERATION
PEAK 86037220 02/12/07
3-4
STARTING
SHUTDOWN AND DAILY MAINTENANCE
CHEMICAL
CHECK VALVE
SOLUTION SCREEN
1. CLOSE CHEMICAL METERING VALVE.
2. ALLOW THE UNIT TO RUN FOR 2 MINUTES WITH THE VACUUM HOSE DISCONNECTED TO REMOVE MOISTURE AND SPRAY WD40 (OR EQUIVALENT) INTO
THE VACUUM LUBRICATION CUP. THIS WILL PREVENT CORROSION DUE TO MOISTURE.
3. SET ENGINE THROTTLE AT IDLE POSITION AND OPEN TEMP CONTROL VALVE, ALLOWING THE WATER TEMPERATURE TO COOL DOWN.
4. TURN OFF IGNITION SWITCH.
5. DISCONNECT ALL HOSES AND TOOLS.
6. DRAIN WASTE TANK INTO AN APPROVED SOURCE AND RINSE WITH CLEAN WATER.
1. CONNECT WATER HOSE TO WATER INLET CONNECTION AND TURN ON WATER SUPPLY.
2. CONNECT CLEANING AND VACUUM HOSES TO THE DESIRED CLEANING TOOL AND CONSOLE.
3. PULL OUT ENGINE CHOKE,TURN SOLUTION PUMP TO OVERRIDE AND TURN IGNITION KEY TO START.
4. PUSH IN ENGINE CHOKE AFTER ENGINE HAS STARTED.
5. SET THROTTLE AT IDLE (PUSH THROTTLE CABLE IN)
6. INSERT CHEMICAL INLET AND PRIME TUBING INTO CHEMICAL CONTAINER.
7. TURN CHEMICAL PRIME VALVE TO PRIME AND ALLOW CHEMICAL TO CIRCULATE. AFTER ALL AIR BUBBLES HAVE BEEN REMOVED FROM THE CHEMICAL
TUBING, TURN THE CHEMICAL PRIME VALVE TO THE ON POSITION AND OPEN THE CHEMICAL FLOW VALVE. WITH THE TOOL ATTACHED AND THE CHEMICAL
FLOW VALVE OPEN, SET THE DESIRED CHEMICAL FLOW RATE WHILE OBSERVING THE FLOW METER INDICATOR.
8. FOR QUICK HEAT-UP, REFER TO OPERATING INSTRUCTIONS.
CONDENSED OPERATING INSTRUCTIONS
SOLUTION PRESSURE
REGULATOR
LUBRICATE REGULATOR SEALS
EVERY 50 HOURS.
RECOMMENDED LUBRICANT:
SYNCO SUPER LUBE
SOLUTION OUTLET