ENGLISH
Translation of the German original user manual 30
It is recommended to leave the portafilter in the brew group, keeping it warm for optimum
temperature for coffee dispension.
If you would like to plumb your machine, installation through a qualified service
technician is required.
6.2 PID-display funcitons
6.2.1 Programming the temperature of both boilers
During normal operations the temperatures of the coffee boiler (t1, left dot on the display) and the steam
boiler (t2, right dot on the display) are indicated alternately.
The controls are factory pre-set so that both boilers are heated consecutively, whereby the coffee boiler
(t1) has priority. This means that the steam boiler (t2) is activated only after the programmed temperature
of the coffee boiler has been reached.
Please take the following steps to program the temperature of both boilers:
1. Switch the machine on in order to activate both boilers (switch in
programming. Both heaters are inactive during programming.
3. Press +
temperature value. The nominal temperature value is displayed.
4. Quickly press
to decrease
+ to increase
the nominal temperature value.
5. Please wait a short while after having set the nominal temperature
value;
7. Press +
temperature value. The nominal temperature value is displayed.