EasyManua.ls Logo

Quincy Compressor QGD-40-BMD - Starting; During Operation

Quincy Compressor QGD-40-BMD
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.3 Starting
For the position of the air outlet valve and the drain connections, see sections
Introduction and Condensate system.
Airlogic² control panel
Procedure
1. Open the air outlet valve.
2. Switch on the voltage. Check that voltage on LED (6) lights up.
3. Press start button (1) on the control panel. The compressor starts running and the automatic
operation LED (8) lights up. Ten seconds after starting, the drive motor switches over from
star to delta and the compressor starts running loaded.
5.4 During operation
Warnings
The operator must apply all relevant Safety precautions. Also consult section Problem
solving.
Keep the doors closed during operation. They may be opened for short periods only to
carry out checks.
When the motors are stopped and LED (8) (automatic operation) is alight, the motors
may start automatically.
Instruction book
78 2920 7190 02

Related product manuals