EasyManua.ls Logo

Rauch AXIS-M 30.2 - Checking the Screw Connections of the Weigh Cells (Version W)

Rauch AXIS-M 30.2
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and service 10
112
10.3.3 Checking the screw connections of the weigh cells (version W)
The machine is equipped with 2 weigh cells and a tie rod. These elements are
fixed by means of screw connections.
Check the screw connections for the weigh cells and the tie rod for tightness on
both sides of the machine:
before every spreading season
also during the spreading season if necessary.
Checking:
1. Tighten the screw connec-
tion with a torque wrench
(Tightening torque =
300 Nm).
Figure 10.5: Fastening the weigh cells (on
the left side of the direction of
travel)
2. Tighten the screw connec-
tion [1] with a torque wrench
(Tightening torque = 65 Nm).
Figure 10.6: Fastening the tie rod at the
weigh frame

Table of Contents

Related product manuals