EasyManua.ls Logo

Rauch AXIS-M 30.2 - Instructions Regarding the Spreading Operation

Rauch AXIS-M 30.2
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Spreading operation 8
78
8.2 Instructions regarding the spreading operation
The intended use of the machine includes compliance with the operating, main-
tenance, and service conditions in accordance with the manufacturer specifica-
tions. Spreading operation therefore always includes preparation and
cleaning/maintenance.
Carry out spreading operations in accordance with the sequence described
below.
Preparation
Install the spreader at the tractor Page 46
Close the metering slide
Pre-set the mounting height Page 53
Fill in the fertiliser Page 59
Adjust the application rate Page 79
Set the working width
- Select the correct spreading disc
- Adjust the drop point
Page 81
Page 84
Spreading
Travel to the spreading location
Check the mounting height
Engage the PTO shaft
Open the slider and start spreading
Finish spreading operations, and close the
slide
Disengage the PTO shaft
Discharge residual material Page 99
Cleaning/maintenance
Open the metering slide
Remove the spreader from the tractor
Cleaning and maintenance Page 107

Table of Contents

Related product manuals