The application of CDA:
If the CDA is provided by the customer, it must be cooled and dried by the dryer, then
filtered by 5μm-particle and 0.3μm-particle filter, and 0.1μm atomized lubricator. The
temperature of CDA must be in the range of 5~40, and the highest dew point is 0(It
is suggested the temperature of CDA is 5 below the temperature of cooling water).
The pressure of CDA is below 0.1 MPa, the flow rate is 10 LPM, and the outer diameter
of pipe mated with the connector is 6mm.
If the CDA filter module provided by Raycus is used, the CDA should be also cooled and
dried by the dryer, and the pressure should be below 0.8MPa, the outer diameter of pipe
mated with the connector is 6mm.
The CDA should be input 30 min before the start of the laser. If the ambient temperature
is below 25 and the humidity is below 50%, the CDA is unnecessary.
4.3 Power Connection
CAUTION: Before connecting the product to AC supply source, you must
check for sure that the AC supply you will apply is in accordance with the
specifications provided in Table 3.
Table 7 Power Connection Requirements
Model
RFL-C4000S
Supply Source
380±10% V AC 50/60Hz
Power Cord
One End of Power Cord
Four wires labeled L1L2L3and PE.
Sign Description
L1L2L3-> Phase Line
PE-> Protective Earth