Avoid high temperature fluctuations.
5.4 Required tools for unloading and transport
Required tools:
•
Unloading - Forklift
•
Transport - Pallet truck
5.5 Place of storage
•
Keep the machine sealed in its packaging until it is assembled or installed.
•
The storage location must be dry, free of dust, caustic materials, vapors and combustible materials.
•
Store in a storage room or packaged with adequate weather protection.
•
Avoid exposure of the machine to shocks or vibrations.
•
Avoid extreme temperature fluctuations.
•
Take particular care when packing away electronic components.
•
When storing for a longer period, apply a coat of oil to all bare-metal machine parts.
•
Regularly check the overall condition of all parts and of the packaging.
5.6 Transport inspection and reporting of defects
•
Immediately after receipt inspect the delivery to ensure that it is complete and has not suffered any
damage.
•
If any transport damage is visible, do not accept the delivery, or accept it only with reservation.
•
Record the scope of the damage on the transport documents or delivery note.
•
For all defects that are not discovered upon delivery, be sure to report them as soon as they are
detected, since damage claims must be filed within a certain period, as mandated by law.
5.7 Unpacking the machine
Only trained and authorized personnel are allowed to transport and unpack the machine. In order to prevent
wooden parts from falling or the machine tipping over, you should be very careful when opening the crate.
Information
Only trained and authorized personnel may transport and unpack the machine. To prevent
wooden parts from falling or the machine from tilting, be very careful when opening the transport
box.
ENGLISH
ENGLISH
38 / 81