6.8 Proof Load Testing
(NOTE: RML website www.reflexmarine.com/support should be checked for the latest version of the
tables in this section)
Question
Response
When must a Proof Load
Test be conducted?
Immediately after any of the following events:
i. After replacement of any critical parts, does not apply to
replacement of sling sets.
ii. After any suspected damage arising from overloading or
impact.
iii. If the history of the FROG unit is uncertain.
iv. If the inspection data plate is missing, illegible or out of date.
Who must conduct this
test?
The Load Test must be carried out by an independent test house
company with nationally recognised accreditation in accordance with
ILO 152.
A competent and certified test person.
Does this test require a
formal record?
Yes.
What drawings are
required to support this
test?
The required drawings are available in Appendix B.
What equipment is
required to perform this
test?
i. Loading weights or sand bags (1145 kg).
ii. Certified weighing scale or load cell.
iii. Lifting equipment certified for > 5 Tonnes SWL.
iv. A ladder or top access platform.
v. An inspection frame or floor matting.
vi. Good lighting.
A suitable means of safely accessing the top and the bottom parts of
the FROG-3 is required. When using a step ladder or ladder it must
be securely fixed to prevent slippage whilst accessing the top of the
FROG. The FROG-3 can be laid on its side on protective matting, or
the use of a secure inspection frame assembly to safely access the
underside of the FROG- 3 is recommended. Do not go underneath an
active lift.
Be aware that in some regions “Working at Height” regulations may
apply.