09.04.20920-294
LOG SET INSTALLATION
Page 4 of 4
17. Test fire to ensure proper light off (make sure flame flows smoothly).
If there is any flame hesitation, check that area for any blockage
of the burner ports.
Diagram 18-Final Installation
Diagram 17-Install Log 12
12
7
G600EC/G600C
16. Install Log 12 on the firebox floor near Log 7, as shown.
1
12
2 3
4
5
6
7
8
9
1011
Glass crystals must be placed at least 1" away from the front edge of the unit.