EasyManuals Logo

Renishaw ATOM User Manual

Renishaw ATOM
75 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
27
www.renishaw.com
NOTE: The FPC cable must be connected before tting the readhead lid. The lid is secured by the readhead mounting screws.
Approved ESD precautions must be followed at all times during readhead electrical connection.
2. Applying pressure to the whole locking lever, push it down to lock the FPC cable in place.
Inserting the FPC cable
1. Ensure the locking lever is up (open) before fullyinserting the FPC cable into the connector.
3. When the system has been connected, proceed with'Readhead mounting and alignment' on page 37 and 'System calibration' on page45.
CAUTION: Check the correct orientation of the cable before
inserting into the connector. The readhead will be shipped with
the connector in the open position.
CAUTION: Do not push the locking lever down if no FPC cable
is inserted as this will damage the locking mechanism.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Renishaw ATOM and is the answer not in the manual?

Renishaw ATOM Specifications

General IconGeneral
BrandRenishaw
ModelATOM
CategoryMedia Converter
LanguageEnglish

Related product manuals