INSTALLATION
14
2.9
Installation on old systems or systems in need
of upgrading
When R AARIA START is installed on old systems or systems in
need of upgrading, it is recommended to ensure that:
the electrical system is compliant with the applicable reg-
ulations and has been installed by qualified professionals
9
In the event of a replacement, the system must be inspected
by the designer or by another competent person, and must
be compliant with the technical requirements, as well as
the current legislations and regulations.
9
The manufacturer shall bear no responsibility for any dam-
ages caused by incorrect system installation.
2.10
Refrigerating connection
The dimensions and positions of R AARIA START cooling con-
nections are shown hereunder.
MODEL 25 - 35
1 Gas line connection
2 Service connection
3 Liquid line connection
1
2
3
MODEL 50 - 70
1 Gas line connection
2 Liquid line connection
3 Service connection
1
2
3
1
2
3
50 70
Model 25 35 50 70
Connections
Liquid line connection 1/4 Pollici
Gas line connection 3/8 1/2 Pollici
Charge connection 1/2 Pollici
Liquid line connection 6,35 mm
Gas line connection 9,52 12,7 mm
Charge connection 12,7 mm
To access the cooling connections:
unscrew the fastening screw
push down the connection covering panel
remove the connection covering panel
The cooling pipes must respect the lengths and differences in
height as indicated in the following table.
A
B
A
B
Model 25 35 50 70
A 10 15 m
B 15 25 m
Maximum length with
standard charge
7 m
Additional charge 20 g/m
Use pipes with the thickness indicated in the following table:
Pipe Ø Thickness
mm inches mm
6,35 1/4 0,8
9,52 3/8 0,8
12,70 1/2 0,8
15,88 5/8 1,0
Maximum operating pressure 4.3 Mpa.
9
In case of a drop in excess of 5 m, a siphon must be installed
every 5-7 metres.
9
The given measures are the maximum permitted values.
9
Cooling connections featuring shut-off valves are preconfig-
ured for flare connections.
9
Cooling lines must be as straight as possible and any neces-
sary bends must have a radius grater than 40 mm.
9
Use clean hoses. Make sure the inside is free of dust, resi-
dues, water.
9
Avoid the entry of uncondensable gases (air) in the circuit,
otherwise, with the unit in operation, high pressures with
the risk of damages might ensue.