18 | Linear operation guide: 13562-B 02-19
Installation checklist
The installer must complete the installation checklist below and make sure this
guide is left with you. They must also instruct you about the use and care of the
appliance, and ensure you understand the safety instructions.
Checklist
F Appliance positioned in a suitable location (clearances, mantels, surrounds, cavity ventilation).
F Rinnai ue system installed and tested to ensure effective draw.
F Gas pressure checked and set according to the data plate.
F Burn media installed as per instructions.
F Appliance tested for correct operation and to ensure no gas leaks.
F Customer instructed on operating procedure and safety requirements.
F Customer advised to service the heater every two years.
Installer details
Company name:
Installer name:
Address:
Phone: Mobile:
Certicate of compliance number for installation:
Signed: Date: