Installation
Quantum:EV OpenCharge EVQROCM-01-V01-R0 Installation and Operation Manual
Page 14 of 21 September 2020
Applicable to Three Phase models:
x OCPP0422
x OCPP0423
Figure 10 Double Socket Three Phase Quantum OCPP – Schematic
D20
400V
6000
IEC 60898
ACEN0098
I
O
D20
400V
6000
IEC 60898
ACEN0098
I
O
16 15 13
NE
CP PP
L1
L2L3
12
24
11
23
10
22
9
21
8
20
7
19
6
18
5
17
4231
14
Relais Control
(1)(2)
Socket Control (2 )
Socket Control (1 )
Card reader(1)Card reader(2)
12
24
1
13
n
p
-+
rs485 / power
SIM
GPRS
L AN
status
GREENF LUX S MAR T
CHARGING CONTROLL ER
(FRONT VIEW)
A2
A1
14
11
12
LIVE 1
INCO MING SU PPLY
3
GREENF LUX S MAR T
CHARGING CONTROLL ER
(RHS V IEW)
GREENFLUX SMA RT CHARGING
CONTROLL ER (LHS V IEW)
2
1
SNUBBER
10.8-13.8V Max.2A Max.24Watt
OUTPUT: 12V -2A
E
CP PP
N
L3 L2
L1
+V
N
INPUT: 100-240V AC
0.88A 50/60Hz
A1
L
-V
11
A2
12
14
3
2
1
SNUBBER
SOCKET 1 SOCKET 2
AB
1000imp/kWh
DTS353F-2
EN50470- 1/3
kWh
-25°C to 55°C
3X230/400V
0,25-5(80)A
50Hz
1 35 7
24 23 21 20
2468
AB
1000imp/kWh
DTS353F-2
EN50470- 1/3
kWh
-25°C to 55°C
3X230/400V
0,25-5(80)A
50Hz
1 35 7
24 23 21 20
2468
12V0V
LIVE 2
LIVE 3
NEUTRAL
EARTH
ACEQ 0040
C6
2N
N1
N
N
T
4
4 - WHITE CABLE
4
ACEO 0240
63A
30mA
400/415V 50/60/Hz
N13 5
N246
ACEO 0240
63A
30mA
400/415V 50/60/Hz
N1 35
N24 6
12
11
10
10
9
8
7
6
5
2
1
SDASCLMOSIMISOIQRGNDRST3.3V
A1
A2
ACSE0320
A1
135
7(13)
246
8(14)
A2
A1 1
3
5 7(13)
426
8(14)
A2
240V~
Ie(AC -7a)
Ue:400V
AC-7a
AC-7b
IEC/ EN 61095
IEC/ EN 60947- 4-1
20A
Ui:500 V
16kW/ 3~ 400V
4kW/ 3~4 00V
ACSE0320
A1
135
7(13)
246
8(14)
A2
A1 1
3
5 7(13)
426
8(14)
A2
240V~
Ie(AC -7a)
Ue:400V
AC-7a
AC-7b
IEC/ EN 61095
IEC/ EN 60947- 4-1
20A
Ui:500 V
16kW/ 3~ 400V
4kW/ 3~4 00V
A1
A2
ACEQ 0040
C6
2N
N1
N
N
T
LN
SW/L
PHOTOCELL
10x 1W LED LIGHTS (WHITE)
AC-L (Brown) DC V+ (Red)
AC-N (BLUE )
DC V- (Rlack )
LED Driver
Mod el: LD010H-CU03536-51
Inpu t: 100-240Vac ~ 0.25A 50/60Hz
Outpu t: 25-36Vdc 350mA
Watt: 12.6W Max.
ta=6 0° C tc= 90° C
Constan t Current
Class 2 Power Supply
IP67
WHITE CABLE
ACCORDANCE
WITH CURRENT
Installation
EVQROCM-01-V01-R0 Installation and Operation Manual Quantum:EV OpenCharge
September 2020 Page 15 of 21
Before Installation
IMPORTANT: OLEV Installations
For ‘Office for Low Emission Vehicles’ (OLEV) WCS grant funded installations, make sure
to collect all information/photographs required to register the product and the
1. Quantum:EV OpenCharge units using GPRS to communicate with the cloud-based
back office require a suitable GPRS signal of 14 CSQ or better.
NOTE: Units using GPRS
contain a roaming SIM card which will always connect to the
strongest signal available. It is assumed that a suitable GP
RS signal has already been
verified by the end user/installer prior to installation.
x Rolec cannot be held responsible or accountable in the event a GPRS unit is
installed in a location without adequate network signal.
2. Establish a suitable site location for the unit that is both secure and environmentally
safe.
3. Make sure the location meets current legislation (if applicable).
4. Make sure there is a suitable mains power supply available at the installation site.
5. If required, make sure a functioning ethernet cable is present.
6. Make sure that the unit and any accessories have not been damaged in transit.
NOTE: Items damaged in transit must first be reported to the courier and then to the
supplier.
Where possible, photographic evidence of package and/or unit
provided.
7. Make sure the unit model is correct and matches the order.
NOTE: Incorrect or damaged units must NOT be installed. Contact your supplier to
discuss rectification.