Installation
EVQROCM-01-V01-R0 Installation and Operation Manual Quantum:EV OpenCharge
September 2020 Page 15 of 21
Before Installation
IMPORTANT: OLEV Installations
For ‘Office for Low Emission Vehicles’ (OLEV) WCS grant funded installations, make sure
to collect all information/photographs required to register the product and the
installation with OLEV.
1. Quantum:EV OpenCharge units using GPRS to communicate with the cloud-based
back office require a suitable GPRS signal of 14 CSQ or better.
NOTE: Units using GPRS
contain a roaming SIM card which will always connect to the
strongest signal available. It is assumed that a suitable GP
RS signal has already been
verified by the end user/installer prior to installation.
x Rolec cannot be held responsible or accountable in the event a GPRS unit is
installed in a location without adequate network signal.
2. Establish a suitable site location for the unit that is both secure and environmentally
safe.
3. Make sure the location meets current legislation (if applicable).
4. Make sure there is a suitable mains power supply available at the installation site.
5. If required, make sure a functioning ethernet cable is present.
6. Make sure that the unit and any accessories have not been damaged in transit.
NOTE: Items damaged in transit must first be reported to the courier and then to the
supplier.
Where possible, photographic evidence of package and/or unit
damage should be
provided.
7. Make sure the unit model is correct and matches the order.
NOTE: Incorrect or damaged units must NOT be installed. Contact your supplier to
discuss rectification.
Installation
EVQROCM-01-V01-R0 Installation and Operation Manual Quantum:EV OpenCharge
September 2020 Page 15 of 21
Before Installation
IMPORTANT: OLEV Installations
For ‘Office for Low Emission Vehicles’ (OLEV) WCS grant funded installations, make sure
to collect all information/photographs required to register the product and the
installation with OLEV.
1. Quantum:EV OpenCharge units using GPRS to communicate with the cloud-based
back office require a suitable GPRS signal of 14 CSQ or better.
NOTE: Units using GPRS contain a roaming SIM card which will always connect to the
strongest signal available. It is assumed that a suitable GPRS signal has already been
verified by the end user/installer prior to installation.
x Rolec cannot be held responsible or accountable in the event a GPRS unit is
installed in a location without adequate network signal.
2. Establish a suitable site location for the unit that is both secure and environmentally
safe.
3. Make sure the location meets current legislation (if applicable).
4. Make sure there is a suitable mains power supply available at the installation site.
5. If required, make sure a functioning ethernet cable is present.
6. Make sure that the unit and any accessories have not been damaged in transit.
NOTE: Items damaged in transit must first be reported to the courier and then to the
supplier.
Where possible, photographic evidence of package and/or unit damage should be
provided.
7. Make sure the unit model is correct and matches the order.
NOTE: Incorrect or damaged units must NOT be installed. Contact your supplier to
discuss rectification.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ROLEC OCPP0410 and is the answer not in the manual?

ROLEC OCPP0410 Specifications

General IconGeneral
BrandROLEC
ModelOCPP0410
CategoryBattery Charger
LanguageEnglish

Related product manuals