EasyManua.ls Logo

ROLEC OCPP0410 - Before Installation; OLEV Installations; General Preparation

ROLEC OCPP0410
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
EVQROCM-01-V01-R0 Installation and Operation Manual Quantum:EV OpenCharge
September 2020 Page 15 of 21
Before Installation
IMPORTANT: OLEV Installations
For ‘Office for Low Emission Vehicles’ (OLEV) WCS grant funded installations, make sure
to collect all information/photographs required to register the product and the
installation with OLEV.
1. Quantum:EV OpenCharge units using GPRS to communicate with the cloud-based
back office require a suitable GPRS signal of 14 CSQ or better.
NOTE: Units using GPRS
contain a roaming SIM card which will always connect to the
strongest signal available. It is assumed that a suitable GP
RS signal has already been
verified by the end user/installer prior to installation.
x Rolec cannot be held responsible or accountable in the event a GPRS unit is
installed in a location without adequate network signal.
2. Establish a suitable site location for the unit that is both secure and environmentally
safe.
3. Make sure the location meets current legislation (if applicable).
4. Make sure there is a suitable mains power supply available at the installation site.
5. If required, make sure a functioning ethernet cable is present.
6. Make sure that the unit and any accessories have not been damaged in transit.
NOTE: Items damaged in transit must first be reported to the courier and then to the
supplier.
Where possible, photographic evidence of package and/or unit
damage should be
provided.
7. Make sure the unit model is correct and matches the order.
NOTE: Incorrect or damaged units must NOT be installed. Contact your supplier to
discuss rectification.
Installation
EVQROCM-01-V01-R0 Installation and Operation Manual Quantum:EV OpenCharge
September 2020 Page 15 of 21
Before Installation
IMPORTANT: OLEV Installations
For ‘Office for Low Emission Vehicles’ (OLEV) WCS grant funded installations, make sure
to collect all information/photographs required to register the product and the
installation with OLEV.
1. Quantum:EV OpenCharge units using GPRS to communicate with the cloud-based
back office require a suitable GPRS signal of 14 CSQ or better.
NOTE: Units using GPRS contain a roaming SIM card which will always connect to the
strongest signal available. It is assumed that a suitable GPRS signal has already been
verified by the end user/installer prior to installation.
x Rolec cannot be held responsible or accountable in the event a GPRS unit is
installed in a location without adequate network signal.
2. Establish a suitable site location for the unit that is both secure and environmentally
safe.
3. Make sure the location meets current legislation (if applicable).
4. Make sure there is a suitable mains power supply available at the installation site.
5. If required, make sure a functioning ethernet cable is present.
6. Make sure that the unit and any accessories have not been damaged in transit.
NOTE: Items damaged in transit must first be reported to the courier and then to the
supplier.
Where possible, photographic evidence of package and/or unit damage should be
provided.
7. Make sure the unit model is correct and matches the order.
NOTE: Incorrect or damaged units must NOT be installed. Contact your supplier to
discuss rectification.

Related product manuals