18
Purpose
This procedure establishes the minimum requirements for the lockout of energy that could cause injury to per-
sonnel by the operation of lifts in need of repair or being serviced. All employees shall comply with this proce-
dure.
Responsibility
The responsibility for assuring that this procedure is followed is binding upon all employees and service per-
sonnel from outside service companies (i.e., Authorized Rotary Installers, contactors, etc.). All employees shall
be instructed in the safety significance of the lockout procedure by the facility owner/manager. Each new or
transferred employee along with visiting outside service personnel shall be instructed by the owner/manager (or
assigned designee) in the purpose and use of the lockout procedure.
Preparation
Employees authorized to perform lockout shall ensure that the appropriate energy isolating device (i.e., circuit
breaker, fuse, disconnect, etc.) is identified for the lift being locked out. Other such devices for other equipment
may be located in close proximity of the appropriate energy isolating device. If the identity of the device is in
question, see the shop supervisor for resolution. Assure that proper authorization is received prior to performing
the lockout procedure.
SequenceofLockoutProcedure
1) Notify all affected employees that a lockout is being performed and the reason for it.
2) Unload the subject lift. Shut it down and assure the disconnect switch is “OFF” if one is provided on
the lift.
3) The authorized lockout person operates the main energy isolation device removing power to the sub-
ject lift.
• Ifthisisalockabledevice,theauthorizedlockoutpersonplacestheassignedpadlockonthe
device to prevent its unintentional reactivation. An appropriate tag is applied stating the person’s
name, at least 3” x 6” in size, an easily noticeably color, and states not to operate device
or remove tag.
• Ifthisdeviceisanon-lockablecircuitbreakerorfuse,replacewitha“dummy”deviceandtagit
appropriately as mentioned above.
4) Attempt to operate lift to assure the lockout is working. Be sure to return any switches to the “OFF”
position.
5) The equipment is now locked out and ready for the required maintenance or service.
RestoringEquipmenttoService
1) Assure the work on the lift is complete and the area is clear of tools, vehicles, and personnel.
2) At this point, the authorized person can remove the lock (or dummy circuit breaker or fuse) & tag
and activate the energy isolating device so that the lift may again be placed into operation.
RulesforUsingLockoutProcedure
Use the Lockout Procedure whenever the lift is being repaired or serviced, waiting for repair when current
operation could cause possible injury to personnel, or for any other situation when unintentional operation could
injure personnel. No attempt shall be made to operate the lift when the energy isolating device is locked out.
LIFTLOCKOUT/TAGOUTPROCEDURE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotary 1000 SERIES and is the answer not in the manual?

Rotary 1000 SERIES Specifications

General IconGeneral
BrandRotary
Model1000 SERIES
CategoryLifting Systems
LanguageEnglish

Related product manuals