3 x Installation
18
FA ROTEX Solaris - 08/2007
3.2.3 Installing the temperature sensor
1. Bend mounting springs on both sensors (storage tank and return flow sensor and storage tank sensor of the boiler control)
and insert in the sensor tube.
2. Align return flow sensor in the sensor tube to approx. 130 cm insertion depth (cable binder).
3. Align storage tank sensor in the sensor tube to approx. 70cm insertion depth (cable binder).
4. Push the sealing plug into the sensor tube and route the cables.
Fig. 3-36 Steps 1 + 2 Fig. 3-37 Optional FlowGuard
CAUTION!
On no account may the storage tank temperature sensor of the boiler controller be inserted more than 75 cm
into the sensor dip sleeve. A sensor that is inserted too deeply can lead to overheating of the consumption water
section and the control unit can "hang" during the storage tank charging phase.
Fig. 3-38 Step 1 Fig. 3-39 Steps 2 + 3 Fig. 3-40 Steps 2 + 3
Fig. 3-41 Step 4