VLT
Vertical Process Pump
13 V1.090418
3. TRANSPORT & STORAGE
3.1 SHIPPING ARRANGEMENTS
The pump is shipped completely assembled from the plant.
A wooden skid and supports are furnished for support and ease of transportation. Pump must be
transported horizontally.
The suction can is shipped as a separate item from the pump.
3.2 UNLOADING AND CHECKING EQUIPMENT
NOTE: The information portrayed in this section is intended as a general guideline. For further
information refer to the corresponding section in API Recommended Practices 686.
The following steps should be completed for all pumps when received.
1. Handle all equipment carefully.
2. Remove unit only by properly supporting the wooden shipping skid.
3. After unloading, inspect the pump, check the shipment against the packing list, and report
damages or shortages immediately to freight carrier and to the designated Ruhrpumpen
representative.
3.3 TRANSPORT
To avoid damage, the unit must be transported and handled with care. It
should be gently lowered onto an even surface. Pay attention to and identify
the signs marking the points of equilibrium and fastening places for ropes, or
the openings for forklift trucks.
Observe the plant’s safety precautions when lifting heavy components.
When transporting with a crane, use a goal-like accessory and sling two ropes
around the balancing points of the pump, as the figure shown below, and
carefully lift it.