O&M Manual –90E1720004
Section 7 Energizing the Bypass-Isolation Transfer Switch Page 26 of 52
l. Verify that the transfer switch transfers to the S2 source by check the
status on the RPTCS OIP.
m. Cancel the load test and verify that the engine shuts down.
n. Take the bypass switch out of bypass to the non-bypass position.
o. Close all downstream load circuit breakers.
p. Perform a load test.
q. Verify that the transfer switch transfers to the S2 source by checking the
status on the RPTCS OIP.
r. Cancel the load test and verify that the engine shuts down.