CHS2 Series
30
5.3 Communication Connection
Figure 5.5
Ports definition
5.3.1 Export Limit Setting
The meter communication cable can be connected to the Meter_485 of the Phoenix terminal of the inverter
and the METER interface of the RJ45.
Grid
L1
L2
L3
N
RS485
SET SE C
1 4 7 10
13 14 16 17 19 21 24 25
3 6 9 10
Meter
CT
CT installation:
The arrow direction
points to the in v erert
Figure 5.6
Export Limit Setting
5.3.2 Dry Contact Connection
Reserved output dry contact
D RY.DO1 DRY.DO2
NC COM NO NO COM NC
AC Breaker
L1
L2
L3
N
Loads
A1
A2
NO
COM
Inverter
Figure 5.7
Connect the Reserved
output dry contact
Generator start and stop control signal
NO
COM
Inverter
GEN
NO COM NC
Generator
Figure 5.8
Connect the Generator

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SAJ CHS2 Series and is the answer not in the manual?

SAJ CHS2 Series Specifications

General IconGeneral
BrandSAJ
ModelCHS2 Series
CategoryStorage
LanguageEnglish

Related product manuals