EasyManua.ls Logo

SAJ CHS2 Series - Export Limit Configuration; App-Based Export Limit Settings

SAJ CHS2 Series
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHS2 Series
56
6.8 Export Limit Setting
6.8.1 APP Setting
There are two methods to control the export limit, the two methods are alternative to each other.
Method 1: Export limitation setting is to control the export electricity to the grid.
Method 2: Generation limit is to control the electricity generated by the inverter.

Related product manuals