EasyManua.ls Logo

Samsung IER Series - Page 60

Samsung IER Series
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
59
6. S-Box Installation and Connection
Product recommend installing this product in a standard 19-inch server rack, please refer 35 page about basic
installation guide.
• How to install when use Multi Link HDR function
Please open rubber plug of Multi Link HDR port.
Connect the connector of the cable of Multi Link HDR to the
Multi Link HDR port of each S-BOX.
(※ Note : Connect the connectors structure to face up)
Menu Picture LED HDR Multi Link HDR Settings ON
Set the quantity of S-BOX connected each other. (2/3/4)
Set S-BOX ID
(※ ID must not be duplicated between linked S-BOX )
Multi Link HDR Port
Multi Link HDR Port
UP
SIDE
(No support for SBB-SNOWJAU or below models)

Related product manuals