EasyManua.ls Logo

Samwon Tech SDR100E Series - Page 30

Samwon Tech SDR100E Series
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
(2) Graph recording saving screen
[Fig. 4-12] Operation screen in case of saving graph (Vertical)
1
2
4
3
The screen for saving the graph record is composed of 3 screens.
Each channel is displayed with unique color. The name of each channel can be set.
The current PV is displayed on the scale bar. The PV display
method is set with tag or bar in [Motion setting] [Refer to 1]
Display the corresponding time (Date/time) to each axis
display screen magnification
The channel No. and unit, measure data are displayed for each channel
The corresponding channel is not displayed for each channel when
(Activation box) is pressed.
The corresponding channel is displayed when it is pressed again.
[Reference 1] PV display method screen (Tag) [Reference 1] PV display method screen (Bar)