16
ԙ
The logo displaying screen and the initial screen are displayed sequentially when the electric power is switched ON after installation of the product and
it converts to the graph recording screen automatically.
ԙ
It takes about 20 seconds in screen loading
ԙ
When button is pressed at the top of the graph recording screen, the sub menu bar is displayed and when is pressed, it converts to the main screen.
2-3. Basic operation flow chart
Loading screen
System parameter setting screen Password input screen Main screen
Initial screen Graph recording screen