Commissioning ProLab 2000
20
ba75577e03 11/2009
3.3 Initial commissioning
Perform the following activities:
z Insert the batteries (see page 95)
z Connect the power pack (see page 19).
z Switch on the meter (see page 21)
z Set the language (see page 25)
z Set the date and time (see page 27)
z Set up the access authorization for electronic keys (see page 29)