Assembly
09.00 | MPG | Assembly and Operating Manual | en | 389213
25
Item Mounting MPG
16 20 25 32 40 50 64 80
1 Thread in the main
air connections
* M3 M3 M5 M5 M5 M4 M5
Max. depth of
engagement from
locating surface [mm]
- 3 3.5 4.5 5 5 5 5
2 Hose-free direct
connection
dimensions
- - M3 M3 M3 M3 M3 M4
* For this size, the hose clips are pre-assembled at the factory and
the compressed air hoses prescribed by SCHUNK must be used,
see catalog data sheet. Procedure for leaking compressed air
connection, see section "Troubleshooting".