EasyManua.ls Logo

SCHUNK UFG 26 - Assembly and Connection; Assembly Procedure; Fastening Details

Default Icon
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Assembly and Connection
3.1 ASSEMBLY
NOTE:
The gripper must be aligned during assembly
since it is not equipped with fixing bores.
3 fastening threads
UFG 26 M 8 x 17
UFG 32 M 8 x 20
3 Fastening bores
for M8 DIN EN ISO 4762
in the plastic bag
Page -5-

Related product manuals