EasyManua.ls Logo

Sega Transformers Human Alliance - 7-2 Work Procedures:

Sega Transformers Human Alliance
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
7-2 Work Procedures:
1 After Opening package(Take care not to drop for Billboard and POP),
please assemble Billboard and POP together in advance.
2 After opening the side door of the LCD, install the Billboard assembly.
Locked by 4 pcs of
screws(the screws
ocked false lon the
Billboard)
The 2 pcs of metal( put in the coin box) locked false
by 4 pcs of screws(locked false on the Billboard)
Locked false by 2 pcs of screws
(Locked false on the machine)
Locked tightly by 2 pcs of screws (put into the coin box),and then
connected by 2pcs of connector and locked tightly upside by 6 pcs of screws
(Please see the left picture in green and circle location in blue)
and last lock the backside door of the LCD.
http://op.sega.jp/op_e/

Table of Contents

Related product manuals