EasyManua.ls Logo

Segway Snarler AT6 S - Winch Operation Guide

Segway Snarler AT6 S
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
102
load. Do not pull for more than 1 minute, or near to
maximum rated load. If the winch motor gets very
hot, stop winching and let it cool down for a few
minutes.
Always be sure that at least five (5) full turns of
winch cable are wrapped around the winch drum.
Avoid pulling from extreme angles, as this will
cause the winch cable to accumulate at one end
of the drum and damage the cable.
Be aware, that the maximum pulling capacity of the
winch is the maximum pulling capacity on the first
layer only - only the first layer can be pulled in max.
winch capacity. Do not overload the winch.
Never hook the cable back to itself; otherwise the
cable will be damaged. Use trunk protection
protector.
Before operation, make sure that the winch is
firmly fixed to the vehicle or bracket.
Before moving heavy objects, check the winch
cable to prevent kinks and uneven wire layers. The
slacked cable must be properly tightened under a
weight of about 50 kg.
When pulling the load, be sure to lay a blanket or
protective cloth on the cable near the hook end.
This will prevent the possibility of breaking the
wire cable and help prevent serious injuries and
damage.

Table of Contents

Other manuals for Segway Snarler AT6 S

Related product manuals