EasyManua.ls Logo

Seko SAM 5-ME - Control Panel Maintenance; Monthly Control Panel Interventions; Six-Monthly Control Panel Interventions

Seko SAM 5-ME
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
6.1 Maintenance of the control panel
With reference to the norms (D.P.R. 547/55 -D.Lgs.
626/94 - Ref. to norms CEI 64-8 IV ed.)
The elctric control panel will have to be
checked regularly by specialised personnel,
making the requested ordinary maintenace
interventions. The interventions must be
registered in a maintenance register stating
clearly the kind of intervention, the date and
the name of the technician who made the
check.
6.1.1 Monthly interventions
x Check of correct function of the electronic board;
x Check of the correct functioning of the internal
ventilation;
x Cleaning of the filter of the forced ventilation;
6.1.2 Interventions every 6 months
x Check of the integrity and efficiency of the electric
supply line;
x Fastening of the connections;
x Check of the integrity of the carpentry and
repainting where and if is needed;
x Lubrication of the locks and hinge;
x Check and eventual substitution of the air filters
of the fans for the forced ventilation;

Related product manuals