IN0016 Revision 12 Part # 004573 – 12 of 22
SP PRO Three Phase
Installation Notes
POWER PERFORMANCE PASSION
Each end of the shunt must be connected to a minimum of 3 x 70mm
2
V90HT cables or
equivalent with a minimum length of cable to the next device of 500mm. This wiring is critical
as it is used to conduct the heat away from the 800A current shunt.
Warning: The current shunt can operate at high temperatures so care must be taken to
ensure there is no possibility of the shunt contacting with other wiring, devices, heat sensitive
items or non-authorised personnel.
DC cabling and 800A current shunt installation
Main DC over
current protection:
630A HRC fuses
Individual
inverter wiring
protection:
250A HRC
fuses