IN0016 Revision 12 Part # 004573 – 19 of 22
POWER PERFORMANCE PASSION
SP PRO Three Phase
Installation Notes
DC Shutdown and Generator Lock Out Override
The low battery voltage generator start and DC shutdown voltages need to be lower on L2 and
L3 than L1. This allows L1 to start the generator before any of the phases’ shutdown.
Disable Generator Control on L2 and L3
Normally only L1 is required to control the generator so in this case the Generator Controller
setting on L2 and L3 are set to disabled.