EasyManua.ls Logo

Sharp AL-800

Sharp AL-800
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
2
Installation
2
INSTALLATION
Follow the procedure below for proper installation.
COPIER INSTALLATION
Improper installation may damage the copier. Please note the following during initial installation
and whenever the copier is moved.
If the copier is moved from a cool place to a warm place, condensation may
form inside the copier. Operation in this condition will cause poor copy quality
and malfunctions. Leave the copier at room temperature for at least 2 hours
before use.
Do not install your copier in areas that are:
damp, humid, or very dusty
exposed to direct sunlight
poorly ventilated
subject to extreme temperature or humidity
changes, e.g., near an air conditioner or
heater.

Related product manuals