4-1
CHAPTER 4
Transportation and Installation
4.1 Disassembly and packaging
4.1.1 General
Electrical equipment should be designed to stand transportation and storage under
the temperature between -25 and+55. If this is impossible, proper measurements
must be taken to endure the high temperature. The criteria for this measurement is
that it can withstand the affection of the high temperature of +70 within 24 hours.
Other considerations like to prevent damage from vibration or shock must be also
given.
4.1.2 Packaging
When sold and being shipped to customer’s plant, The machine needs to be
packaged and fastened in place.
a. The way to fasten the machine is illustrated as above diagram.
b.
Press the “LOCK” button to lock 12 & 3 position.
c.
4 is a wooden blockDue to its weight, it might lose its accuracy during transportation.
It is to support the weight of the Arm and prevent from collision each other when test
running. (Please don’t move it when unpacking.)
d. The block is added to help the Column support the Gearbox.
e.
5 is a fastening screw.When being packaged, the machine needs to be fastened with
screws. Otherwise, the machine might move during transportation and make the
center of the gravity slant, therefore bring the risk that the machine falls.
f.
6 is the wooden crate baseIt will ease the movement by a forklift.
Precaution:
All levers must be tightened. Please refer to the chapter 1, regarding the transportation.
MODEL LENGTH WIDTH HIGHT
TPR-1230 2035mm 995mm 2240mm
TPR-1230H 2035mm 995mm 2240mm
TPR-1600H 2820mm 1450mm 2920mm
TPR-2000H 3105mm 1400mm 3240mm