EasyManua.ls Logo

Shini STM-910W - Installation and Debugging; Installation Space; Mould and Water Coupling

Shini STM-910W
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
80(107)
3. Installation and Debugging
3.1 Installation Space
During installation of the machine, keep at least 500mm installation space
around the machine as shown by the picture. Do not install the machine in a
position crowded with other objects. This would cause inconvenience to
operation, maintenance and repair.
Do not sit on the machine.
Keep away flammable and explosive goods.
Picture 3-1Installation Space
3.2 Mould and Water Coupling
1) It is necessary, while connecting from the access to mould, to use two
spanners to fix the switching connector and ball valve before screw tightly the
horn nut of the connector pipe, otherwise water might leaks from the
machine.
Picture 3-2Mould and Water Couplings 1

Table of Contents

Related product manuals