Initial Inspection and Testing
ConrmpowertobeconnectedistherequiredDCvoltage.
Power Supply 12V-24V DC is available.
Ensure polarity of the voltage supply is correct.
All electrical connections are correct.
Loose cables are clipped or tied up.
Any un-used connections are isolated and/or sealed.
Yoursystemshouldnowbereadytopoweron.
Dockside Tests
Turn steering wheel fully clockwise.
Visually check moving (mechanical) parts do not foul;
Repeat 1st step for anti-clockwise direction.
Return Steering to centre.
Switch on SP120C AUTOPILOT system
Press arrow button to operate steering in that direction
Check that rudder moves in correct direction does not drive past limits
Check RFU calibration is set if limits are not set
CheckCoursechangeprovidessu󰀩cientRuddermovement.(Automode)
Check compass heading display on SP120C is available.
Return steering to centre.
Check GPS settings are correct as per section
IMPORTANT: Always initially test system at low speeds rst in open water
during calm conditions.