Approach
1.
Guide the cable through the cable gland.
2. Screw the cable gland into the 3/4" NPT opening on the explosion-proof enclosure.
3. Pull the collar on the cable gland so that the cable is securely attached.
5.5 Mount the handles to the cover of the explosion-proof enclosure
Approach
1.
Use the supplied M6 screws to secure the two handles onto the cover of the explo‐
sion-proof enclosure.
2. Tighten the screws with a torque of 4.5 to 5 Nm.
Figure 22: Mounting of the handles
5.6 Installation
Important information
DANGER
Ris
k of ignition or explosion
b
Disconnect the voltage supply before starting to mount the explosion-proof enclo‐
sure to avoid igniting hazardous atmospheres.
b
Only reconnect the voltage supply once you have completed the mounting process.
DANGER
Ris
k of ignition
Failure to observe this information could result in a risk of ignition.
b
If the device is used in an environment classified as tb IIIC, tc IIIB or tc IIIC, the
cover must not be removed, not even temporarily (e.g. for maintenance purposes).
MOUNTING 5
8017023/14Q6/2020-04-27 | SICK O P E R A T I N G I N S T R U C T I O N S | deTec4 Core Ex
35
Subject to change without notice