76/245 
Building Technologies Division  Basic Documentation LME7...   CC1P7105en 
Infrastructure & Cities Sector  13 PME72.521...  29.11.2011 
 
 
Phase 
number 
Function 
LOC  Lockout shutdown phase 
OFF  Standby, waiting for heat request 
oP:P1  Part 1: Request load controller OPEN 
Part 2: Switching point fuel valve 2a (2nd stage) ON by actuator 
Part 3: High-fire reached 
Part 4: Request load controller CLOSE 
Part 5: Switching point fuel valve 2a (2nd stage) OFF by actuator 
Part 6: Low-fire reached 
10  Actuator travels to the CLOSED position, home run 
21  Safety valve ON, air pressure switch in no-load position 
Check if POC is closed, actuator travels to the CLOSED position 
22  Part 1: Fan motor ON 
Part 2: Specified time air pressure switch 
            Message (timeout), stabilization of air pressure switch 
24  Opening time of actuator (timeout) 
30  Part 1: Prepurge time without flame simulation test 
Part 2: Prepurge time with flame simulation test (2.1 seconds) 
36  Closing time of actuator (timeout) 
38  Preignition time  
40  Postignition time  
42  Flame detection 
44  Interval: End of ignition safety time and release of load controller 
72  Opening time of actuator (timeout) 
74  Part 1: Operation is ended 
Part 2: Postpurge time  
90  Pressure switch-min open → safety shutdown 
 
Key to phases