EasyManua.ls Logo

Siemens LMV27.100x2 - 7.5.3.6. Gas shortage program

Siemens LMV27.100x2
219 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58/219
Building Technologies Basic Documentation LMV27... CC1P7541en
7 Basic unit LMV27 17.12.2018
7.5.3.6. Gas shortage program
Valve proving via pressure switch-min-gas (parameter 236 = 2)
As gas pressure switch-min-gas is located between the valves, the gas shortage test
cannot be made in phase 22. Instead, when performing valve proving on startup, the
gas shortage test is performed at the end of the filling time (end of phase 82).
With no valve proving on startup, the gas shortage test is made directly before first
safety time is started (end of phase 39).
No. Parameter
236
Gas: Input pressure switch-min
2 = valve proving (between fuel valve V1 and fuel valve V2) via pressure
switch-min
Standard valve proving (parameter 236 = 1)
If the gas pressure is too low, startup will be aborted in phase 22.
No. Parameter
236
Gas: Input pressure switch-min
1 = pressure switch-min before fuel valve V1 (default setting)
246 Gas: Gas shortage waiting time
If gas shortage occurs with the last of the parameterized number of start attempts, the
system initiates lockout.
No. Parameter
223
Repetition limit pressure switch-min-gas
1 = no repetition
2...15 = 1...14 number of repetitions
16 = constant repetition
Recharging time:
After the Operation phase
In that case, the LMV27 with gas shortage program makes a selectable number of start
attempts until lockout occurs. The waiting time from one start attempt to the next is
doubled each time, starting from an adjustable waiting time.

Table of Contents

Related product manuals