Fail-Safe Modules 
  7.3 PM-E F pp DC24V PROFIsafe power module 
ET 200S Distributed I/O System - Fail-Safe Modules 
Installation and Operating Manual, 08/2008, A5E00103686-07 
89 
Wiring Diagram 
Wire the PM using the special terminal module. 
30
33
30()SS'&9 (0'2
/00
/00
.
.
. .
(0'2
(0'2
3
'2
3
3
'2
0
'2
3
'2
3
'2
3
'2
0
'2
0
'2
0
 
Figure 7-12  Wiring diagram of the PM-E F pp DC24V PROFIsafe 
 
WARNING 
 
Please always use an external fuse for L+ at the PM-E F pp with the following properties to 
protect the relay contacts from overload: Circuit-breaker, characteristics B, 10 A. 
 
Relay Output  
The two contacts of the relay output are used to switch voltage L+. The switched voltage is 
supplied to the external terminal module and to the internal voltage buses P1 and P2. This 
results in two connection options that can be used at the same time, if desired: 
●  One load can be wired directly to the terminal module (K1 in the figure above). 
●  Electronic modules can be supplied by means of the internal voltage buses P1 and P2. 
Loads can be connected to these modules in turn (K2, K3, K4 in the figure above). 
 
WARNING 
 
 
In the event of a cross circuit between 2L+ and DO, the controlled actuator is no longer 
switched off. You should always wire the actuators separately, for example, using 
sheathed cables or separate cable ducts, in order to prevent any cross-circuits between 
2L+ and DO.