EasyManua.ls Logo

Siemens POL638 Series

Siemens POL638 Series
244 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
116 / 244
Siemens Standard application AHU CE1P3977en_02
Building Technologies Detail pages: Time switch program 01.02.2010
Main Index > Unit > Main overview > Time switch program > Calendar
exception
Main Index > Unit > Main overview > Time switch program > Calendar fix
off
Main Index > Unit > Auxiliary > TSP Output > Calendar exception
Parameter Range Function
Present value
Passive
Active
Displays whether a calendar entry is currently
enabled:
No calendar entry is currently enabled.
A calendar entry is currently enabled.
Choice-x
Date
Range
WeekDay
Passive
Specifies the entry for the exception:
A certain day (e.g. Friday).
A period (e.g. vacation).
A certain day of the week.
Entries are ignored.
This value should be set last after the date is
entered.
-(Start)date Choice-x = range: Enter start date for the pe-
riod.
(Choice-x = date: Enter data for a single day).
-End date Choice-x = range: Enter end date for the period.
End date must always be after the start date.
-Week day For Choice-x = weekday only: Enter the day of
the week.
Only the entry in (start) is relevant.
-(start) date = *,01.01.09
Result: January 1, 2009 is an exception date.
-(Start) date = Mo,*.*.00
Every Monday is an exception day.
-(Start) date = *,*.Evn.00
The days for the entire month are exception day for each even month (February,
April, June, August, etc.).
The entries in (start) date and end date are relevant.
-(start) date = *,23.06.09 / -end date = *,12.07.09.
June 23, 2009 through July 12, 2009 are exception days (e.g. vacation).
-(start) date = *,23.12.00 / -end date = *,31.12.00.
December 23 through 31 are exceptions for each year. The entry end date =
*,01.01.00 does not work here, since January 1 is before December 23.
-(start) date = *,23.12.09 / -end date = *,01.01.10.
23. December 23, 2009 through January 1, 2010 are exception days.
-(Start) date = *,*.*.00 / -End date = *,*.*.00
Caution! This entry is always enabled! The plant is continuously on exception or
off.
The entries for week day are relevant.
Week day = *,Fr,*
Every Friday is an exception day.
Week day = *,Fr,Evn
Each Friday in even months (February, April, June, August, etc.) is an exception
day.
Week day = *,*,*
Parameter
Examples for
Choice-x = Date.
Examples for
Choice-1 = Range.
Examples for
Choice-1 = WeekDay.
Basis Document Siemens Climatix Control System
BDCX.100820.01GB
Page 116

Table of Contents

Related product manuals