4 - 1
Siemens AG RXB8-115.034.02 Page 1 of 6 POLYMOBIL III
Medical Solutions Rev. 03 04.05 CS PS 24
Functional checks 4
Checking the control and display elements 4
• Plug the power connection plug into the grounding type wall outlet.
• Press the ON button on the control console (5/Fig. 4).
During power up the system runs through an initialization phase with the following
conditions:
The POLYMOBIL III is ready after the acoustic signal stops.
• Go through the mAs values from 0.32 . . . 200 mAs by pressing the ± mAs buttons
• Go through the kV values from 40 . . . 100 kV by pressing the ± kV buttons
If malfunctions occur during these checks, refer to the
service instructions.
Initialization - - - - - -
kV mAs
Line voltage L
i n - - -
measurement kV mAs
Line voltage L
i n 226 e.g. 226 V AC
display kV mAs
Preferred data 60 10
kV mAs
Exceeding the permissible setting data is not possible.
NOTE
NOTE