POLYMOBIL III RXB8-115.034.02 Page 2 of 2 Siemens AG
Rev. 03 04.05 CS PS 24 Medical Solutions
5 - 2 Final work steps
D
r
af
t
• The system must be switched on during the measurement. Measuring instruments with
automated measuring sequences must therefore be set to manual measurement.
• Enter the highest value as first measured value in the report ’Device leakage current /
report’ (chapter 7 of these instructions).
• This value must not exceed the permissible leakage current values of 2.5 mA according
to DIN VDE 0751-1:2001-10, Table F.1, line "Device leakage current for devices
according to remarks 1 and 3".
• Transfer the current line voltage from the ’Start-up report’ into the report ’Device leakage
current / report’. If the current line voltage deviates from the nominal voltage, then correct
the measured value to the value corresponding to a measurement at the nominal value
of the line voltage. Document this in addition.
• Document the measuring procedure (differential measurement or direct measurement)
and the measuring instrument used (designation and serial number).
Reports 5
• Separate the completed 'Start-up report' (chapter 6 of these instructions) from these
instructions and file it in the system folder, "Certificates" register.
• Separate the completed reports 'Protective conductor resistance / report' and
’Device leakage current / report’ (chapter 7 of these instructions) from these instructions
and file them in the system folder , "Certificates" register.
• Complete the 'Installation Protocol' located on the system and send it (per fax) to the
address stated in the protocol.
Last work steps 5
• Wind the power connection cable onto the cable holder on the back of the control
console.
• Lock the support arm in the traveling position (Fig. 1) and check the forced locking of the
support arm.