EasyManua.ls Logo

Siemens SIMATIC ET 200eco PN M12-L - Page 21

Siemens SIMATIC ET 200eco PN M12-L
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring
3.2 Pin assignment
Communication module CM 8x IO-Link + DI 4x24VDC M12-L (6ES7148-6JG00-0BB0
20 Equipment Manual, 09/2020, A5E49284833-AA
Pin assignment of the connector for infeed of the supply voltage (M12 L-coded)
The table below shows the pin assignment of the M12 L-coded connector for infeed of the
supply voltage.
Table 3- 3 Pin assignment of the supply voltage connector
Pin Assignment of the core
color of the power cable
Assignment
Front view of the connector
X80 connector (POWER
input)
1
Brown
Supply voltage 1L+
(Non-switched)
2
White
Ground 2M (switched)
3
Blue
Ground 1M (non-switched)
4
Black
Load voltage 2L+ (switched)
Pin assignment of the socket for loop-through of the supply voltage (M12 L-coded)
The table below shows the pin assignment of the M12 L-coded socket for loop-through of the
supply voltage.
Table 3- 4 Pin assignment of the supply voltage socket
Pin Assignment of the core
color of the power cable
Assignment
Front view of the socket
X81 socket (POWER output)
1
Brown
Supply voltage 1L+ (non-
switched)
2
White
Ground 2M (switched)
3
Blue
Ground 1M (non-switched)
4
Black
Load voltage 2L+ (switched)

Related product manuals