Electrical connection
6.1 Connecting the machine
1MB..5/6 shaft height 71 ... 355
Operating Instructions, 07/2020, A5E41926185A
71
6.1.2.6 Thread sizes in terminal box Ex e and Ex d
Shaft height
Thread size for additional glands, e.g. PTC thermistor or anti-condensation heating M16x1.5
or M20x1.5
Other thread sizes are possible as an option.
6.1.3 Minimum air clearances
After proper installation, verify that the minimum air clearances between non-insulated parts
are maintained. Be aware of any protruding wire ends.
Table 6- 2 Minimum air clearance dependent on rms value of the alternating voltage Urms
Rms value of the alternating volt-
age
Urms
6 mm
installation altitude of up to 2000 m.
When determining the required minimum air clearance, the voltage value in the table may be in-
creased by a factor of 1.1, so that the rated input voltage range is taken into account during gen-
6.1.4 Internal equipotential bonding
The internal equipotential bonding between the grounding terminal in the terminal box, the
terminal box components and the machine enclosure is ensured via metallic contact, a
copper braided strip or a stranded wire.