Installation
3.2 System Installation
Distributed converter for SIMOGEAR geared motors
36 Getting Started, 04/2018, FW V4.7 SP10, A5E36100338B AG
Installation procedure
Having dismantled the SINAMICS G110M Terminal Housing, the following procedure should
be performed to complete the installation of the whole system.
1.
Star and Delta Configuration
Configure the motor terminals for either star or delta configur
a-
tion depending upon the voltage requirement of the application
and the mains input voltage.
2.
Fit the earth cable to the motor
1.
Secure the earth cable to the motor terminal box.
2.
Ensure that the cable is facing in the correct direction to
allow connection to the earthing post on the Terminal
Housing.
Note:
The earthing cable is supplied with the Terminal Housing.
On the FS80/90 Terminal Housings there are two addit
ional
fixing points which are the earthing points between the
Terminal Housing and the motor. These earthing points
must be used and therefore, the earthing cable does not
need to be fitted.
If the SINAMICS G110M is ordered as a complete system,
then all mechanical and electrical installation is completed
in the factory prior to delivery.