EasyManua.ls Logo

Siemens SINAMICS G110M - Commissioning a Decentralized Drive with the IOP-2

Siemens SINAMICS G110M
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
4.6 Commissioning a decentralized drive with the IOP-2
Distributed converter for SIMOGEAR geared motors
Getting Started, 04/2018, FW V4.7 SP10, A5E36100338B AG
81
4.6
Commissioning a decentralized drive with the IOP-2
Overview
To perform the basic commissioning of a decentralized drive it is necessary to use the IOP-2
Handheld Kit (HHK).
The details of the HHK and the associated cables are given in the Commissioning tools
section of this manual.
See
Commissioning tools (Page 65).
Note
Screens and sequence may vary
The sequence of the commissioning process and the actual screens may vary according to
the following influences:
The firmware version of the Intelligent Operator Panel 2 (IOP-2)
The firmware version of the device being commissioned
The specific type of device being commissioned.
In all the scenarios, the IOP
-2 will always display the appropriate commissioning screens
and sequence for the device to which it is connected.
Select Wizards
Select Basic Comm
issioning
wizard
Select Factory Reset (yes or
no)
Select Continue
Select Control Mode
Select Motor Data

Other manuals for Siemens SINAMICS G110M

Related product manuals