EasyManua.ls Logo

Siemens SINAMICS GL150 - Page 6

Siemens SINAMICS GL150
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.3.3.1 Fuseless technology..............................................................................................................35
3.3.3.2 Thyristor electronics...............................................................................................................36
3.3.3.3 Voltage actual value sensing.................................................................................................37
3.3.3.4 Ground fault detection............................................................................................................38
3.4 Closed-loop control................................................................................................................40
3.4.1 Structure of the open and closed loop control plate...............................................................40
3.4.2 Mushroom pushbutton...........................................................................................................40
3.4.3 Description of the components...............................................................................................41
3.4.3.1 SINAMICS Control Unit..........................................................................................................41
3.4.3.2 DRIVE-CLiQ interface............................................................................................................41
3.4.3.3 Voltage Sensing Module........................................................................................................41
3.4.3.4 Power supply unit...................................................................................................................42
3.4.3.5 Customer terminal strips........................................................................................................42
3.5 Options...................................................................................................................................42
3.5.1 Internal synchronizing voltage detection (option A11)...........................................................42
3.5.2 Damping switch for 1.4 kV (option C50).................................................................................42
3.5.3 Duty cycle (option C61)..........................................................................................................43
3.5.4 Black start (option E05)..........................................................................................................43
3.5.5 Brake after phase shifter operation (option E08)...................................................................43
3.5.6 Plug connection between the starting converter and excitation equipment (option G57) ......44
3.5.7 Temperature evaluation of the MV transformer (option K63).................................................45
3.5.8 Control Unit CU320-2 PN (option K95)..................................................................................45
3.5.9 Inductive cable attenuation (option L05)................................................................................45
3.5.10 Cabinet anti-condensation heating for the power unit (option L55)........................................46
3.5.11 Temperature-controlled and air-humidity-controlled anti-condensation heating (option
L58)........................................................................................................................................46
3.5.12 Dust protection (option M11)..................................................................................................46
3.5.13 Lock barrel (option M40)........................................................................................................47
3.5.14 Degree of protection IP41 (option M41).................................................................................47
3.5.15 Separate installation (M49)....................................................................................................47
3.5.16 Low-noise fan (option M65)....................................................................................................47
3.5.17 Customer-specific door stop for control cabinets (option M76)..............................................47
3.5.18 Line-side surge arresters (option N54)...................................................................................47
3.5.19 Machine-side surge arresters (option N56)............................................................................47
3.5.20 Line-side fuses (option N58)..................................................................................................48
3.5.21 Cabinet lighting in the power unit (option N86)......................................................................48
3.5.22 Customized locking system (option Y41)...............................................................................48
3.5.23 Customized duty cycle (option Y45).......................................................................................48
4 Preparations for use...................................................................................................................................49
4.1 Notes for system integrators..................................................................................................49
4.1.1 Requirements for transformers..............................................................................................49
4.1.2 Selection and configuration of multi-winding transformers.....................................................50
4.1.3 Requirements for the circuit breaker provided by the customer.............................................51
4.1.4 Requirements for cables........................................................................................................54
4.2 Requirements for installation location....................................................................................55
4.3 Inspections when receiving the delivery.................................................................................56
4.3.1 Checking the delivery.............................................................................................................56
4.3.2 Checking shock and tilt indicators..........................................................................................56
4.3.3 Checking the load handling attachments...............................................................................57
Table of contents
SINAMICS GL150 6SL38503UM114PA0Z
6 Operating Instructions 04/2017

Table of Contents

Other manuals for Siemens SINAMICS GL150

Related product manuals